Labour Resources - Cost per Hour
AnsweredHello,
I think that it could be useful to add some simple features in this category.
Labor = (value 1 x value 2) /60* x value 3
Value 1 = number of panels
Value 2= used time per Value 1 (unit min)
60- to get results in (h)
Value 3 = Labor cost per hour
With this option users can easily get much more important information such as approx. time estimation for each operation (total labor costs per each operation) expressed in a time (h) unit. and costs that can be printed in the job summary.
Example:
Operation Cutting (example 25min per sheet)
Operation edging (example 7m/min)
Operation CNC drilling: (example 3min/panel)
Assembly: (example 3min/panel)
... as many operations user need ...
Example:
Job:
5 sheets
55 m
43 panel
Result:
labor 1 cutting: (5x25)/60*100$=
Time: 2.08 hours
Labor Cost: $208.33
labor 2 edging: (7/55)/60*90$=
Time: 0.12h
Labor Cost: $11.45
I think that results can be very useful for making estimations and organization
etc etc...
-
Official comment
Hi Sladjan,
Thank you for the detailed suggestion. We appreciate the time you took to provide us with examples.
We will explore this further in our planning sessions, and you will be notified of updates to this thread.
Feel free to add comments with additional requests or detail to this post.
MaxCut Support Team
Please sign in to leave a comment.
Comments
1 comment